I am trying to find out SAP note or document which can confirm about the availability of temporary kernel which can allow 4.6c to run on the target version of OS and DB (as it allow for oracle as per note 1487754). run the application on the temp SAP kernel while upgrade of application happen along with unicode conversion. upgrade the OS & DB to the latest version.Ģ. I am planning to perform the upgrade as per below main steps.ġ. 2- First split the system at current level itself (ERP 6.0 EHP3), then go for EHP7 separately for both stack. f1- First Upgrade the ECC dual stack till ehp6, then perform Split of the ECC system (ABAP & JAVA), and. SAP ERP Application version - ECC 6.0 EHP7 (Unicode)Īs per the SAP guide - "Upgrade and Update Guide SAP ERP 6.0 Including Enhancement Package 7 ABAP" SAPECC 6.0 Migration & Upgrade Document v1.0. SAP ERP Application version - 4.6c with kernel version 46D_2641 (Non Unicode) Following are the details of the source and target version. I need to upgrade an ERP system to the latest available version which is ECC 6.0 EHP7 along with DB2 and OS upgrade.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |